B-1 Calculator (Small General Service)

Use the calculators to estimate your REC bill.

Non Summer October through May

Enter kWh Usage:  
Enter Transformer Size (kVa), if known:  
     
  Rate Charge
Distribution Costs    
  Single Phase Access Charge
  Energy Delivery
  Additional Charge Based on Transformer
  Capacity if greater than 15 kVa
 
Generation / Transmission Costs    
  Electricity Supply Charges
  Power Cost Adjustment (PCA)
  Demand Response Rider
Total Bill  

Summer June through September

Enter kWh Usage:  
Enter Transformer Size (kVa), if known:  
     
  Rate Charge
Distribution Costs    
  Single Phase Access Charge
  Energy Delivery
  Additional Charge Based on Transformer
  Capacity if greater than 15 kVa
 
Generation / Transmission Costs    
  Electricity Supply Charges
  Power Cost Adjustment (PCA)
  Demand Response Rider
Total Bill  

REC STORIES

The Big Brothers Big Sisters of Greater Fredericksburg has been changing the lives of local children since 1967 by matching them with a one-on-one men...

REC Responds to Storm-Related Outages

Saturday | March 12, 2022
REC line crews, contractors and other field personnel are responding to storm-related outages as strong winds, snow, sleet and bands of heavy rain mov...
Bringing snow, sleet, ice and bitter-cold temperatures, 2022 got off to a rough start! REC is counting down the days to spring with you.