What Members Should Know

The Small Generator Interconnection process on REC's system follows the State jurisdictional Regulations Governing Interconnections of Small Electrical Generators and Storage in Chapter 314 of the Virginia Administrative Code.

State jurisdictional Interconnection requests are categorized into three separate processes in the regulations.

Level 1 – A request to interconnect a certified small generating facility (SGF) no larger than 500 kilowatts (kW) shall be evaluated under the Level 1 process.

Level 2 – A request to interconnect a certified SGF no larger than 2 MW and not qualifying for the Level 1 process shall be evaluated under the Level 2 process.

Level 3 – A request to interconnect an SGF not qualifying for the Level 1 process or Level 2 process shall be evaluated under the Level 3 process.

For questions regarding the Small Generator Interconnection Process, please contact us at RECSGIRequest@myrec.coop.

To submit a Small Generator Interconnection Application, please use Schedule 6 of the Virginia Administrative Code 314 located here.

Small Generator pic with solar panels

REC STORIES

Prepared for New Year's Winter Weather

Friday | January 3, 2025
REC is watching the winter weather system that is projected to affect parts of our service territory starting Sunday, Jan. 5 and continuing into Monda...

Space Heater Safety and Efficiency Tips

Thursday | January 2, 2025
Cozy doesn’t have to mean costly or dangerous. Before you plug in that space heater, check these essential safety and savings tips.
"I don't know if it was God," said Crew Leader Dagoberto Jacome. "But there was some kind of miracle in that moment."